Skip to content
DRULQ SYSTEMS LTD / CRITICAL ASSET TECHNOLOGY
DRULQ
Menu
Contact DRULQ ↗
EDGE INTEGRATION HARDWARE

DRULQ / SOLUTIONS / DRULQ E-CORE G001

Industrial connectivity where operations begin.

Our first-generation edge panel integrates PLC and I/O, a Windows operator interface and industrial networking with the DRULQ software ecosystem.

Industrial connectivity where operations begin.
PRODUCT IDENTITY

DRULQ E-CORE G001

DRULQ E-CORE G001 official logo
CAPABILITIES

What DRULQ E-CORE G001 is designed to support.

  • PLC and industrial I/O
  • Windows-based operator interface
  • Industrial network connectivity
  • Designed for controlled engineering and site validation
PRODUCT STATUS

Prototype and engineering validation

DRULQ discusses site-specific scope and qualification before commercial deployment. Availability and interfaces must be confirmed for each engagement.

Ask about DRULQ E-CORE G001 →
OPERATIONAL CHALLENGE

Why this capability matters.

A site may have operational signals but no convenient bridge into a wider incident and asset-management workflow.

Legacy assets can require scoped integration through compatible PLC, I/O or network interfaces.

An industrial edge panel must be evaluated against field power, wiring, environmental and cybersecurity requirements.

END-TO-END OPERATING MODEL

What happens from first signal to outcome.

01

Survey and design

Document the equipment, control boundaries, available protocols, I/O points and applicable electrical requirements.

02

Integrate site signals

Configure the CLICK PLUS PLC, I/O, industrial Ethernet and Windows edge computer for the agreed interface.

03

Present operating context

Use the touchscreen HMI for authorized local visualization and engineering-approved interactions.

04

Validate and commission

Run factory and site acceptance tests, electrical safety review, communication failure handling and handover documentation.

IMPLEMENTATION & CONTROL

Deployment boundaries and responsibilities.

  • E-CORE G001 is a first-generation engineering prototype, not a certified drop-in replacement for existing safety systems.
  • Specific protocols, compatibility, ingress protection, environmental ratings and certifications require testing and documentation.
  • Remote or supervisory control functions must be explicitly approved and fail safely under site procedures.
CONTINUE EXPLORING

Relevant resources and commercial pathways.

WORK WITH DRULQ

Discuss a defined operational challenge.

We begin with the site, assets, operational requirements and a measurable pilot scope.

Discuss a pilot ↗