Integrate deliberately. Preserve site authority.

Industrial compatibility begins with an interface survey—not a claim that every PLC or SCADA system connects automatically.

Integrate deliberately. Preserve site authority.
INTERFACE DISCOVERY

Establish what is actually available.

  • Identify existing PLC, SCADA, historian, metering and network equipment.
  • Record vendors, device models, protocol versions, points, update rates and licensing constraints.
  • Determine whether access is read-only, advisory or specifically approved for control.
  • Define network segmentation, remote access policies and data ownership with the site.
ENGINEERING WORKFLOW

A controlled commissioning sequence.

STEP 1

Survey

Inventory equipment, signals, network paths and risks.

STEP 2

Design

Document interface mappings, permissions, failure modes and fallback behavior.

STEP 3

Bench test

Verify data quality, timestamping, reconnect behavior and operator presentation.

STEP 4

Site validate

Complete approved acceptance tests, training, documentation and handover.

IMPORTANT LIMITS

Controls and safety are not implied.

DRULQ must not claim universal PLC interoperability, a certified safety function, or an automatically authorized write path. Each integration needs an explicit interface specification and acceptance criteria.

Any control function requires site owner approval, review of interlocks and fail-safe behavior, and documented responsibilities between existing OT systems and DRULQ components.